For a hire studio or a production company’s base: the tall hall as the dry stage, the deep pool for underwater stills and film.

Photo, film and content studio with a shoot pool. District CMUO.
By right: allowed without a hearing. By permit: needs the permit named.
Layout Click a room to see its measurements
Dimensions are from the survey model. Verify on site.
Tinted on the plan.
| No. | Room | Used as | Area |
|---|---|---|---|
| G02 | Main hall, tall partDaylight stage | Daylight stage | 524 SF (48.7 m²) |
| G11 | PoolUnderwater stills and filmBasin not surveyed | Underwater stills and film | 479 SF (44.5 m²) |
| G01 | Main hall, frontHair, make-up, wardrobe | Hair, make-up, wardrobe | 502 SF (46.6 m²) |
| G07 | Rear roomEdit rooms | Edit rooms | 305 SF (28.3 m²) |
| G08 | Back roomEdit rooms | Edit rooms | 225 SF (20.9 m²) |
| G14 | Covered garageCovered load-inOutline assumed | Covered load-in | 492 SF (45.7 m²) |
The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source
For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source
No permit for “Filming entirely on and within private property (no shots or production parking outside)”. Source
For a hire studio, ask the department whether a permit is needed if models, students or the public enter the water for a fee. Source
Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source
Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.
For installing or replacing a pool heater. Source
Fire permits are not transferable. Any change of operator or use needs a new permit. Source
For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source
Ask the SFPUC before the pool is emptied whether this permit applies. Source
Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source
Cost band: medium.
Blackout and backdrop systems, power distribution for lights, pool heating to a shooting temperature, an underwater backdrop and safe entry.
Time band: 1 to 3 months.
Light interior work and recommissioning the pool. No hearing.
What to check for this use before committing.
The city requires no film permit for “Filming entirely on and within private property (no shots or production parking outside)”. Film and photo studios are by right indoors; work in the open-air pool needs a Zoning Administrator letter. If models, students or the public enter the water for a fee, ask the Health Department whether the pool needs a Permit to Operate.