Obia← Back to the building
BuildingPlanUsesLocationFactsEnquire
Obia

584-590 4th St, San Francisco, CA 94107

BuildingPlanUsesLocationFactsFAQSpec sheetEnquire

Represented by Obia. Plans from our survey model. Zoning and permit notes summarise public rules and are not legal advice.

A hall and a lit courtyard

For a venue operator: launches, dinners and company events in the hall, with the lit pool courtyard outside.

Request a viewing

Render of the pool courtyard at dusk with a lit pergola reflected in the water
Pictures are visualisations of proposed furniture and finishes, not photographs. The building is empty today.
Size
3,350 SF building5,350 SF total
Asking rent
$48.00 / SF / year IG$13,400 a month
Term
Negotiable1 free month rent
Zoning
By right
Fit-out cost
Medium
Fit-out time
3 to 6 months

Zoning

Private event venue. District CMUO.

Zoning
By rightBy right, indoors. Entertainment must be inside a completely enclosed, soundproofed building.
By permit
  • Assembly permit (50 or more people)
  • For regular events: Entertainment permit
  • If alcohol is served: Liquor licence
  • Entertainment, indoorsBy rightSec. 102
  • Nighttime entertainment, indoorsBy rightSec. 830, Table 830
  • Courtyard used by patronsBy rightSec. 830, Table 830
  • Outdoor entertainmentNot permittedSec. 830, Table 830

Outdoor entertainment is not permitted: amplified events in the open courtyard are the limit to watch.

By right: allowed without a hearing. By permit: needs the permit named.

Plan

Layout Click a room to see its measurements

G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB
G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB

Measurements Selected room

G02

Main hall, tall part

Render of the tall part of the hall with the walnut wall and ladder to the loft
Across24'-1"7.34 m
Deep22'-5"6.82 m
Area524 SF48.7 m²
Clear height14'-8" to 16'-1"4.47 to 4.90 m

Column-free. Two skylights. Ship's ladder to the loft.

Dimensions are from the survey model. Verify on site.

Rooms for this use

Tinted on the plan.

No.RoomUsed asArea
G02Main hall, tall partHallHall524 SF (48.7 m²)
G01Main hall, frontHallHall502 SF (46.6 m²)
G10Pool courtyardGuests: sitting, eating, drinkingGuests: sitting, eating, drinking1,228 SF (114.1 m²)
G14Covered garageLoading for caterers and crewsOutline assumedLoading for caterers and crews492 SF (45.7 m²)
U01Front officeGreen room or private diningGreen room or private dining407 SF (37.8 m²)
L01Loft officeGreen room or private diningGreen room or private dining141 SF (13.1 m²)

Permits and fit-out

  • Building permitDepartment of Building Inspection

    For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source

  • Place of Entertainment permitFor regular eventsEntertainment Commission

    For regular events: $2,708 application fee, a public hearing, notice posted for 30 days. One-time permits are not a substitute: “The same premises can’t have more than 12 days of entertainment in the same calendar year.” Source

  • Place of Assembly permitSan Francisco Fire Department

    With Fire Department plan review, if the space is set up for 50 or more people. Source

  • State alcohol licenceCalifornia Department of Alcoholic Beverage Control

    “Most investigations take approximately 55-65 days”, with a 30-day posted notice. The city’s restaurant guide: “Be prepared to wait 3-6 months.” Source

  • Accessibility upgradesDepartment of Building Inspection

    Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source

  • Health approval for caterersSF Department of Public Health

    Caterers serving food at events need Health Department approval. Source

Other permits that can apply (8)
  • Permit to Operate a public poolMay applySF Department of Public Health, Environmental Health

    For any tenant who lets customers, students or members into the pool. A new operator applies in its own name. Source

  • Occupancy classificationDepartment of Building Inspection

    Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.

  • New fire permits for a new tenantSan Francisco Fire Department

    Fire permits are not transferable. Any change of operator or use needs a new permit. Source

  • Open flame and candles permitSan Francisco Fire Department

    For candles or open flame where people gather. Fee $446.00. Source

  • Health permit for food and drinkSF Department of Public Health, Environmental Health

    For a restaurant, bar, cafe or catering. A new owner needs a new permit; apply at least one month before opening. Source

  • Limited Live Performance permitEntertainment Commission

    For entertainment as a secondary activity, ending by 10 or 11 pm, with a performance area of at most 200 square feet. $612 application fee. Source

  • Sign permitPlanning Department and Department of Building Inspection

    For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source

  • Building records requestDepartment of Building Inspection, Records Management Division

    Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source

Cost

Cost band: medium.

  1. Low
  2. Medium
  3. High

A room for 50 or more people brings assembly rules: exits, toilets, fire alarm and possibly sprinklers, plus sound control and a secure cover or barrier for the pool.

Time

Time band: 3 to 6 months.

  1. Weeks
  2. 1 to 3 months
  3. 3 to 6 months
  4. 6 months or more

The entertainment permit carries a 30-day posting and a hearing. A liquor licence takes about 55 to 65 days at best. Fire reviews every assembly space for 50 or more.

Improvements
“Ownership is open to providing improvements for qualified tenants.”

Before you sign a lease

What to check for this use before committing.

  • Check at the viewing whether the building has sprinklers.
  • The upper floors are reached by stairs only.
  • A project application for a new building on this lot (2023-009156PRJ) is under review at SF Planning. No decision is recorded.
  • 4th St at Brannan St, Central SoMa. Muni Metro: T Third stop at the door. Caltrain: 0.2 mile. Location

FAQ

More questions

Can I hold events with music? Are events allowed in the courtyard?

Indoor entertainment is by right, and so is nighttime entertainment on this block as the main use, inside an enclosed, soundproofed building. Regular events need an Entertainment Commission permit. Patrons may sit, eat and drink in the courtyard. Outdoor entertainment is not permitted.

What permits does an event venue with amplified music need?

A building permit for the fit-out and change of use, a Place of Entertainment permit from the Entertainment Commission for regular events, a Fire Department Place of Assembly permit when the space is set up for 50 or more people, and a state licence if alcohol is served.

Next steps

Book a viewing, or keep comparing what the building could be.

  • See it in personRequest a viewing
  • Next useSwim school and water-safety training →
  • CompareAll uses for this building →