Obia← Back to the building
BuildingPlanUsesLocationFactsEnquire
Obia

584-590 4th St, San Francisco, CA 94107

BuildingPlanUsesLocationFactsFAQSpec sheetEnquire

Represented by Obia. Plans from our survey model. Zoning and permit notes summarise public rules and are not legal advice.

A small club with a pool courtyard

For a small private club: lounge and bar in the hall, work rooms upstairs, the pool courtyard for members.

Request a viewing

Render of the lounge in the main hall
Pictures are visualisations of proposed furniture and finishes, not photographs. The building is empty today.
Size
3,350 SF building5,350 SF total
Asking rent
$48.00 / SF / year IG$13,400 a month
Term
Negotiable1 free month rent
Zoning
By right
Fit-out cost
High
Fit-out time
3 to 6 months

Zoning

Members' social and wellness club. District CMUO.

Zoning
By rightBy right, filed under what the club does: bar or restaurant, gym, personal service. Members’ swimming needs the pool sign-offs.
By permit
  • Assembly permit (50 or more people)
  • Health permit (food)
  • If alcohol is served: Liquor licence
  • If members swim: Zoning Administrator letter, Health Dept permit
  • If there is regular live or DJ entertainment: Entertainment permit
  • BarBy rightSec. 830, Table 830
  • RestaurantBy rightSec. 830, Table 830
  • Fitness studio with equipmentBy rightSec. 102
  • Health spa, bathhouse, steam roomBy rightSec. 102
  • Courtyard used by patronsBy rightSec. 830, Table 830
  • Members’ swimmingBy permit: Zoning Administrator letterSec. 102

Bar and restaurant are permitted if not a chain.

By right: allowed without a hearing. By permit: needs the permit named.

Plan

Layout Click a room to see its measurements

G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB
G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB

Measurements Selected room

G02

Main hall, tall part

Render of the tall part of the hall with the walnut wall and ladder to the loft
Across24'-1"7.34 m
Deep22'-5"6.82 m
Area524 SF48.7 m²
Clear height14'-8" to 16'-1"4.47 to 4.90 m

Column-free. Two skylights. Ship's ladder to the loft.

Dimensions are from the survey model. Verify on site.

Rooms for this use

Tinted on the plan.

No.RoomUsed asArea
G02Main hall, tall partLounge and barLounge and bar524 SF (48.7 m²)
G01Main hall, frontLounge and barLounge and bar502 SF (46.6 m²)
G10Pool courtyardMembers’ courtyardMembers’ courtyard1,228 SF (114.1 m²)
G11PoolMembers’ poolBasin not surveyedMembers’ pool479 SF (44.5 m²)
U01Front officeWork roomsWork rooms407 SF (37.8 m²)
L01Loft officeWork roomsWork rooms141 SF (13.1 m²)

Permits and fit-out

  • Building permitDepartment of Building Inspection

    For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source

  • State alcohol licenceCalifornia Department of Alcoholic Beverage Control

    “Most investigations take approximately 55-65 days”, with a 30-day posted notice. The city’s restaurant guide: “Be prepared to wait 3-6 months.” Source

  • Place of Assembly permitSan Francisco Fire Department

    With Fire Department plan review, if the space is set up for 50 or more people. Source

  • Accessibility upgradesDepartment of Building Inspection

    Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source

  • Health permit for food and drinkSF Department of Public Health

    For any kitchen or bar food. The city’s restaurant guide: “Apply within 6-8 weeks of your planned open date.” Source

  • Permit to Operate a public poolIf members swimSF Department of Public Health

    A new operator applies in its own name. Plans and a Pool/Spa Data Sheet go to the department if anything is built, remodelled or the equipment is changed. Source

  • Place of Entertainment permitIf there is regular live or DJ entertainmentEntertainment Commission

    For regular events: $2,708 application fee, a public hearing, notice posted for 30 days. One-time permits are not a substitute: “The same premises can’t have more than 12 days of entertainment in the same calendar year.” Source

  • Letter of DeterminationIf members swimSF Planning, Zoning Administrator

    The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source

Other permits that can apply (10)
  • Plan review for pool workSF Department of Public Health, then Department of Building Inspection

    Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.

  • Plumbing permit for a pool heaterDepartment of Building Inspection, Plumbing Inspection Division

    For installing or replacing a pool heater. Source

  • Occupancy classificationDepartment of Building Inspection

    Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.

  • New fire permits for a new tenantSan Francisco Fire Department

    Fire permits are not transferable. Any change of operator or use needs a new permit. Source

  • Open flame and candles permitSan Francisco Fire Department

    For candles or open flame where people gather. Fee $446.00. Source

  • Massage establishment permitSF Department of Public Health, Environmental Health

    General Establishment permit for two or more practitioners, Sole Practitioner permit for one. Zoning: permitted on the ground floor, conditional on the 2nd floor. Source

  • Limited Live Performance permitEntertainment Commission

    For entertainment as a secondary activity, ending by 10 or 11 pm, with a performance area of at most 200 square feet. $612 application fee. Source

  • Sign permitPlanning Department and Department of Building Inspection

    For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source

  • Wastewater discharge permit for draining the poolSan Francisco Public Utilities Commission, pretreatment programme

    Ask the SFPUC before the pool is emptied whether this permit applies. Source

  • Building records requestDepartment of Building Inspection, Records Management Division

    Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source

Cost

Cost band: high.

  1. Low
  2. Medium
  3. High

A bar, some kitchen, lounge finishes, showers and lockers, assembly-level exits and fire systems, and a pool to public standard.

Time

Time band: 3 to 6 months.

  1. Weeks
  2. 1 to 3 months
  3. 3 to 6 months
  4. 6 months or more

The liquor licence, Fire and Health reviews, then construction. It could run longer.

Improvements
“Ownership is open to providing improvements for qualified tenants.”

Before you sign a lease

What to check for this use before committing.

  • Several licences come before opening: alcohol, assembly, food, and the pool if members swim.
  • The floor area, over two floors, limits numbers.
  • A project application for a new building on this lot (2023-009156PRJ) is under review at SF Planning. No decision is recorded.
  • 4th St at Brannan St, Central SoMa. Muni Metro: T Third stop at the door. Caltrain: 0.2 mile. Location

FAQ

More questions

Can a private members' club open here?

By right for its parts. The code has no heading for a commercial members' club: it is filed under what it does, bar or restaurant, gym, personal service, each by right when not a chain. Members' swimming needs a Zoning Administrator letter and a Health Department permit for the pool.

Next steps

Book a viewing, or keep comparing what the building could be.

  • See it in personRequest a viewing
  • Next useIndependent restaurant or bar with a pool courtyard →
  • CompareAll uses for this building →