For a small private club: lounge and bar in the hall, work rooms upstairs, the pool courtyard for members.

Members' social and wellness club. District CMUO.
Bar and restaurant are permitted if not a chain.
By right: allowed without a hearing. By permit: needs the permit named.
Layout Click a room to see its measurements
Dimensions are from the survey model. Verify on site.
Tinted on the plan.
| No. | Room | Used as | Area |
|---|---|---|---|
| G02 | Main hall, tall partLounge and bar | Lounge and bar | 524 SF (48.7 m²) |
| G01 | Main hall, frontLounge and bar | Lounge and bar | 502 SF (46.6 m²) |
| G10 | Pool courtyardMembers’ courtyard | Members’ courtyard | 1,228 SF (114.1 m²) |
| G11 | PoolMembers’ poolBasin not surveyed | Members’ pool | 479 SF (44.5 m²) |
| U01 | Front officeWork rooms | Work rooms | 407 SF (37.8 m²) |
| L01 | Loft officeWork rooms | Work rooms | 141 SF (13.1 m²) |
For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source
“Most investigations take approximately 55-65 days”, with a 30-day posted notice. The city’s restaurant guide: “Be prepared to wait 3-6 months.” Source
With Fire Department plan review, if the space is set up for 50 or more people. Source
Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source
For any kitchen or bar food. The city’s restaurant guide: “Apply within 6-8 weeks of your planned open date.” Source
A new operator applies in its own name. Plans and a Pool/Spa Data Sheet go to the department if anything is built, remodelled or the equipment is changed. Source
For regular events: $2,708 application fee, a public hearing, notice posted for 30 days. One-time permits are not a substitute: “The same premises can’t have more than 12 days of entertainment in the same calendar year.” Source
The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source
Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.
For installing or replacing a pool heater. Source
Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.
Fire permits are not transferable. Any change of operator or use needs a new permit. Source
For candles or open flame where people gather. Fee $446.00. Source
General Establishment permit for two or more practitioners, Sole Practitioner permit for one. Zoning: permitted on the ground floor, conditional on the 2nd floor. Source
For entertainment as a secondary activity, ending by 10 or 11 pm, with a performance area of at most 200 square feet. $612 application fee. Source
For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source
Ask the SFPUC before the pool is emptied whether this permit applies. Source
Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source
Cost band: high.
A bar, some kitchen, lounge finishes, showers and lockers, assembly-level exits and fire systems, and a pool to public standard.
Time band: 3 to 6 months.
The liquor licence, Fire and Health reviews, then construction. It could run longer.
What to check for this use before committing.
By right for its parts. The code has no heading for a commercial members' club: it is filed under what it does, bar or restaurant, gym, personal service, each by right when not a chain. Members' swimming needs a Zoning Administrator letter and a Health Department permit for the pool.