For an independent restaurant or bar: a dining room in the hall that opens onto the lit courtyard.

Independent restaurant or bar with a pool courtyard. District CMUO.
Chain food and drink is not permitted in this district.
By right: allowed without a hearing. By permit: needs the permit named.
Layout Click a room to see its measurements
Dimensions are from the survey model. Verify on site.
Tinted on the plan.
| No. | Room | Used as | Area |
|---|---|---|---|
| G02 | Main hall, tall partDining room | Dining room | 524 SF (48.7 m²) |
| G01 | Main hall, frontDining room | Dining room | 502 SF (46.6 m²) |
| G10 | Pool courtyardSeating, eating and drinking | Seating, eating and drinking | 1,228 SF (114.1 m²) |
For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source
For any kitchen or bar food. The city’s restaurant guide: “Apply within 6-8 weeks of your planned open date.” Source
“Most investigations take approximately 55-65 days”, with a 30-day posted notice. The city’s restaurant guide: “Be prepared to wait 3-6 months.” Source
The city: “Get an estimate of the water capacity charge from the SFPUC before you sign a lease.” It can be high where the space was not a restaurant before. Source
Required in the kitchen. Source
With Fire Department plan review, if the space is set up for 50 or more people. Source
Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source
For any tenant who lets customers, students or members into the pool. A new operator applies in its own name. Source
Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.
Fire permits are not transferable. Any change of operator or use needs a new permit. Source
For candles or open flame where people gather. Fee $446.00. Source
For entertainment as a secondary activity, ending by 10 or 11 pm, with a performance area of at most 200 square feet. $612 application fee. Source
For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source
Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source
Cost band: high.
A commercial kitchen where none exists: exhaust hood and duct to the roof, grease interceptor, gas, floor drains, more toilets, and the water capacity charge.
Time band: 6 months or more.
Change of use to restaurant, Health plan check, kitchen construction, and a liquor licence the city says to expect in 3 to 6 months.
What to check for this use before committing.
An independent restaurant, cafe or bar is by right, with a health permit and, for alcohol, a state licence. Chain restaurants, chain cafes and chain bars are not permitted in this district.
A building permit, a Health Permit to Operate, grease-capture equipment in the kitchen, and a state licence if alcohol is served. The city advises getting an estimate of the water capacity charge from the SFPUC before signing a lease.