For a hardware team: lab and office, with a private pool about 10 ft deep as the test tank outside the door.

Underwater robotics and waterproof hardware lab. District CMUO.
The first 25 ft of depth at the 4th St ground-floor front must hold an active commercial use. Office and laboratory are not active uses there without a Zoning Administrator modification. Light manufacturing counts as an active use.
By right: allowed without a hearing. By permit: needs the permit named.
Layout Click a room to see its measurements
Dimensions are from the survey model. Verify on site.
Tinted on the plan.
| No. | Room | Used as | Area |
|---|---|---|---|
| G11 | PoolTest tankBasin not surveyed | Test tank | 479 SF (44.5 m²) |
| G10 | Pool courtyardOut of public view | Out of public view | 1,228 SF (114.1 m²) |
| G14 | Covered garageLevel loadingOutline assumed | Level loading | 492 SF (45.7 m²) |
| G02 | Main hall, tall partBenches and rigs | Benches and rigs | 524 SF (48.7 m²) |
| G07 | Rear roomWorkshop | Workshop | 305 SF (28.3 m²) |
| G08 | Back roomWorkshop | Workshop | 225 SF (20.9 m²) |
| U01 | Front officeDesk work | Desk work | 407 SF (37.8 m²) |
| L01 | Loft officeDesk work | Desk work | 141 SF (13.1 m²) |
The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source
For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source
Keep the front of the hall as an active use (showroom, gallery, public demo room, light manufacturing) or ask for an administrative modification under Planning Code Sec. 145.4(e).
Ask the department whether a pool used only by staff for equipment tests counts as a public pool. Source
Applies to battery storage and charging. Ask the Fire Department for the requirements.
Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source
Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.
For installing or replacing a pool heater. Source
The department lists an operational permit for compressed gas ($446.00). Ask the Bureau of Fire Prevention which quantities trigger it. Source
Fire permits are not transferable. Any change of operator or use needs a new permit. Source
For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source
Ask the SFPUC before the pool is emptied whether this permit applies. Source
Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source
Cost band: medium.
Benches, extra power circuits, a hoist at the pool edge, and getting the pool plant running.
Time band: 1 to 3 months.
Electrical work and recommissioning the pool. No hearing if the front stays an active use. A modification request or a power upgrade from the utility adds time.
What to check for this use before committing.
Laboratory and light manufacturing are by right; a laboratory belongs upstairs or behind the street front. Testing in the open-air pool needs a Zoning Administrator letter, and whether a pool used only by staff counts as a public pool is a question for the Health Department.