Obia← Back to the building
BuildingPlanUsesLocationFactsEnquire
Obia

584-590 4th St, San Francisco, CA 94107

BuildingPlanUsesLocationFactsFAQSpec sheetEnquire

Represented by Obia. Plans from our survey model. Zoning and permit notes summarise public rules and are not legal advice.

A bathhouse around a deep pool

For a social bathhouse: saunas in the courtyard, the deep pool as the plunge, the hall as lounge and changing rooms.

Request a viewing

Render of the pool with the pergola seating area beyond
Pictures are visualisations of proposed furniture and finishes, not photographs. The building is empty today.
Size
3,350 SF building5,350 SF total
Asking rent
$48.00 / SF / year IG$13,400 a month
Term
Negotiable1 free month rent
Zoning
By rightPool by permit
Fit-out cost
High
Fit-out time
3 to 6 months

Zoning

Sauna and cold-plunge bathhouse. District CMUO.

Zoning
By rightA bathhouse is a personal service, by right. The open-air pool, the core of the business, needs a Zoning Administrator letter and a Health Department permit.
By permit
  • Pool: Zoning Administrator letter
  • Pool: Health Dept permit
  • Assembly permit (50 or more people)
  • If massage is on the 2nd floor: Conditional Use authorization
  • Health spa, bathhouse, steam roomBy rightSec. 102
  • Courtyard used by patronsBy rightSec. 830, Table 830
  • The pool as the plungeBy permit: Zoning Administrator letterSec. 102
  • Massage, ground floorBy rightSec. 830, Table 830
  • Massage, 2nd floorBy permit: Conditional Use authorizationSec. 830, Table 830

A venue run under Health Code Article 47 is a different use, and conditional.

By right: allowed without a hearing. By permit: needs the permit named.

Plan

Layout Click a room to see its measurements

G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB
G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB

Measurements Selected room

G10

Pool courtyard

Render of the pool courtyard at dusk with a lit pergola reflected in the water
Across23'-3"7.09 m
Deep55'-4"16.86 m
Area1,228 SF114.1 m²
Clear heightOpen to the sky

Walled on four sides, open to the sky.

Dimensions are from the survey model. Verify on site.

Rooms for this use

Tinted on the plan.

No.RoomUsed asArea
G10Pool courtyardSaunas, outdoor bathingSaunas, outdoor bathing1,228 SF (114.1 m²)
G11PoolPlungeBasin not surveyedPlunge479 SF (44.5 m²)
G14Covered garageSauna roomsOutline assumedSauna rooms492 SF (45.7 m²)
G01Main hall, frontReception, lockersReception, lockers502 SF (46.6 m²)
G02Main hall, tall partShowers, loungeShowers, lounge524 SF (48.7 m²)
U01Front officeQuiet roomsQuiet rooms407 SF (37.8 m²)
L01Loft officeQuiet roomsQuiet rooms141 SF (13.1 m²)

Permits and fit-out

  • Letter of DeterminationSF Planning, Zoning Administrator

    The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source

  • Building permitDepartment of Building Inspection

    For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source

  • Permit to Operate a public poolSF Department of Public Health

    A new operator applies in its own name. Plans and a Pool/Spa Data Sheet go to the department if anything is built, remodelled or the equipment is changed. Source

  • Accessible way into the poolAmericans with Disabilities Act

    A pool under 300 linear feet of wall needs one accessible entry, “either a pool lift or a sloped entry”; for an existing pool, “to the extent that it is readily achievable”. Source

  • Accessibility upgradesDepartment of Building Inspection

    Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source

  • Place of Assembly permitSan Francisco Fire Department

    With Fire Department plan review, if the space is set up for 50 or more people. Source

  • Cold plunge rules (state bill AB 2330)State of California

    Not law. The bill would bring cold spas under public pool law. It was held in committee on 14 May 2026. Source

  • Plumbing, mechanical and electrical permitsDepartment of Building Inspection

    For sauna heaters, new showers and drains.

  • Massage establishment permitIf massage is offeredSF Department of Public Health

    Massage is permitted on the ground floor with this permit. On the 2nd floor it also needs a Conditional Use authorization. Source

Other permits that can apply (8)
  • Plan review for pool workSF Department of Public Health, then Department of Building Inspection

    Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.

  • Plumbing permit for a pool heaterDepartment of Building Inspection, Plumbing Inspection Division

    For installing or replacing a pool heater. Source

  • Occupancy classificationDepartment of Building Inspection

    Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.

  • New fire permits for a new tenantSan Francisco Fire Department

    Fire permits are not transferable. Any change of operator or use needs a new permit. Source

  • Open flame and candles permitSan Francisco Fire Department

    For candles or open flame where people gather. Fee $446.00. Source

  • Sign permitPlanning Department and Department of Building Inspection

    For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source

  • Wastewater discharge permit for draining the poolSan Francisco Public Utilities Commission, pretreatment programme

    Ask the SFPUC before the pool is emptied whether this permit applies. Source

  • Building records requestDepartment of Building Inspection, Records Management Division

    Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source

Cost

Cost band: high.

  1. Low
  2. Medium
  3. High

Sauna rooms, showers, lockers, drainage, ventilation, water heating, and a pool brought up to public standard: plumbing and mechanical work throughout.

Time

Time band: 3 to 6 months.

  1. Weeks
  2. 1 to 3 months
  3. 3 to 6 months
  4. 6 months or more

No zoning hearing for a personal-service bathhouse. Plan review by Building, Fire and Health for the wet rooms and the pool, then construction.

Improvements
“Ownership is open to providing improvements for qualified tenants.”

Before you sign a lease

What to check for this use before committing.

  • The pool needs its Zoning Administrator letter, and the state rules for cold plunges may change.
  • An outdoor pool and saunas use a lot of energy and water. Have the utility capacity checked.
  • A project application for a new building on this lot (2023-009156PRJ) is under review at SF Planning. No decision is recorded.
  • 4th St at Brannan St, Central SoMa. Muni Metro: T Third stop at the door. Caltrain: 0.2 mile. Location

FAQ

More questions

Is a sauna, cold plunge or bathhouse allowed?

Personal service is by right, and the code's definition names health spas, bathhouses and steam rooms. Use of the open-air pool needs a Zoning Administrator letter and a Health Department permit. Massage on the 2nd floor needs a Conditional Use authorization.

Next steps

Book a viewing, or keep comparing what the building could be.

  • See it in personRequest a viewing
  • Next usePhoto, film and content studio with a shoot pool →
  • CompareAll uses for this building →