Obia← Back to the building
BuildingPlanUsesLocationFactsEnquire
Obia

584-590 4th St, San Francisco, CA 94107

BuildingPlanUsesLocationFactsFAQSpec sheetEnquire

Represented by Obia. Plans from our survey model. Zoning and permit notes summarise public rules and are not legal advice.

A dive school with its own pool

For a dive school and shop that teaches in its own deep pool.

Request a viewing

Render looking along the pool toward the building at dusk
Pictures are visualisations of proposed furniture and finishes, not photographs. The building is empty today.
Size
3,350 SF building5,350 SF total
Asking rent
$48.00 / SF / year IG$13,400 a month
Term
Negotiable1 free month rent
Zoning
By rightPool by permit
Fit-out cost
Medium
Fit-out time
1 to 3 months

Zoning

Scuba and freediving training centre. District CMUO.

Zoning
By rightThe shop and the classes are by right. Teaching in the open-air pool needs a Zoning Administrator letter and a Health Department permit.
By permit
  • Pool: Zoning Administrator letter
  • Pool: Health Dept permit
  • ShopBy rightSec. 830, Table 830
  • Classes held indoorsBy rightSec. 102
  • Teaching in the open-air poolBy permit: Zoning Administrator letterSec. 102

By right: allowed without a hearing. By permit: needs the permit named.

Plan

Layout Click a room to see its measurements

G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB
G01Main hall, frontG02Main hall, tall partG03G04G05G06G07Rear roomG08Back roomG09G10Pool courtyardG11Pool13'-2" × 36'-7"approx. 10 ft deepG12G13G14Covered garageoutline assumed4th StEntryN01020 ft05 mMeasuredAssumedOverhead26'-11"8.20 m22'-5"6.83 m29'-1"8.87 m78'-5"23.90 m24'-3"7.38 m25'-0"7.63 m49'-3"15.01 mAABB

Measurements Selected room

G11

Pool

Render of the pool water and the lit courtyard wall at dusk
Across13'-2"4.01 m
Deep36'-7"11.16 m
Area479 SF44.5 m²
Depthapprox. 10 ftapprox. 3 m

Approximately 10 ft deep, as listed. Basin not surveyed.

Dimensions are from the survey model. Verify on site.

Rooms for this use

Tinted on the plan.

No.RoomUsed asArea
G11PoolTraining in deep waterBasin not surveyedTraining in deep water479 SF (44.5 m²)
G10Pool courtyardWalled pool deckWalled pool deck1,228 SF (114.1 m²)
G01Main hall, frontShopShop502 SF (46.6 m²)
G07Rear roomWorkshop: gear, fill stationWorkshop: gear, fill station305 SF (28.3 m²)
G08Back roomWorkshopWorkshop225 SF (20.9 m²)
G14Covered garageTanks and vansOutline assumedTanks and vans492 SF (45.7 m²)
U01Front officeClassroom and officesClassroom and offices407 SF (37.8 m²)

Permits and fit-out

  • Letter of DeterminationSF Planning, Zoning Administrator

    The written answer on how a business that uses the open-air pool is classified. No duration is published for this letter. Source

  • Building permitDepartment of Building Inspection

    For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source

  • Permit to Operate a public poolSF Department of Public Health

    A new operator applies in its own name. Plans and a Pool/Spa Data Sheet go to the department if anything is built, remodelled or the equipment is changed. Source

  • Lifeguard service and a defibrillatorState of California, Health and Safety Code 116045

    Required at a pool where a direct fee is charged for pool use. Source

  • Accessible way into the poolAmericans with Disabilities Act

    A pool under 300 linear feet of wall needs one accessible entry, “either a pool lift or a sloped entry”; for an existing pool, “to the extent that it is readily achievable”. Source

  • Compressed gas (tank fill station)San Francisco Fire Department

    The department lists an operational permit for compressed gas. Ask the Bureau of Fire Prevention whether a breathing-air fill station needs one. Source

Other permits that can apply (8)
  • Plan review for pool workSF Department of Public Health, then Department of Building Inspection

    Before any work on the pool shell, deck, enclosure, plumbing, filtration or heater.

  • Plumbing permit for a pool heaterDepartment of Building Inspection, Plumbing Inspection Division

    For installing or replacing a pool heater. Source

  • Occupancy classificationDepartment of Building Inspection

    Under 50 occupants an assembly use is classed as business (Group B). At 50 or more it becomes Group A, which changes the exiting and fire protection requirements.

  • Accessibility upgradesDepartment of Building Inspection

    With any permitted alteration. Below the state valuation threshold, path-of-travel upgrades are capped at 20% of the adjusted construction cost; above it, a fully accessible path of travel is required. Source

  • New fire permits for a new tenantSan Francisco Fire Department

    Fire permits are not transferable. Any change of operator or use needs a new permit. Source

  • Sign permitPlanning Department and Department of Building Inspection

    For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source

  • Wastewater discharge permit for draining the poolSan Francisco Public Utilities Commission, pretreatment programme

    Ask the SFPUC before the pool is emptied whether this permit applies. Source

  • Building records requestDepartment of Building Inspection, Records Management Division

    Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source

Cost

Cost band: medium.

  1. Low
  2. Medium
  3. High

Shop fixtures and a classroom indoors. The cost sits in the pool: its pump, filter and heater need inspecting, and a pool lift or a new heater would add to it.

Time

Time band: 1 to 3 months.

  1. Weeks
  2. 1 to 3 months
  3. 3 to 6 months
  4. 6 months or more

No hearing for the shop. The open items are the Zoning Administrator’s letter and the pool permit with its inspection. Remodelling the pool means plan review and 3 to 6 months.

Improvements
“Ownership is open to providing improvements for qualified tenants.”

Before you sign a lease

What to check for this use before committing.

  • Ask the owner for the pool’s service records and depth profile before signing.
  • Lifeguard and defibrillator duties apply where a direct fee is charged for pool use.
  • A project application for a new building on this lot (2023-009156PRJ) is under review at SF Planning. No decision is recorded.
  • 4th St at Brannan St, Central SoMa. Muni Metro: T Third stop at the door. Caltrain: 0.2 mile. Location

FAQ

More questions

Can I run a dive school or a swim school in the pool?

The shop and indoor classes are by right. Teaching in the open-air pool is by permit: it needs a Zoning Administrator letter, because district uses must be within an enclosed building with named exceptions, and a Health Department Permit to Operate.

Do I need a health permit to teach scuba or swimming in the pool?

San Francisco's Health Department says: “All public pool and spa operators must have a valid Permit to Operate”. A new operator needs their own permit, and state rules count swim school and club pools as public pools.

Next steps

Book a viewing, or keep comparing what the building could be.

  • See it in personRequest a viewing
  • Next useUnderwater robotics and waterproof hardware lab →
  • CompareAll uses for this building →