For a small team: desks upstairs and at the back, a demo room or gallery at the street front, and a private courtyard.

Small company headquarters with a public front. District CMUO.
The first 25 ft of depth at the 4th St ground-floor front must hold an active commercial use. Office and laboratory are not active uses there without a Zoning Administrator modification.
By right: allowed without a hearing. By permit: needs the permit named.
Layout Click a room to see its measurements
Dimensions are from the survey model. Verify on site.
Tinted on the plan.
| No. | Room | Used as | Area |
|---|---|---|---|
| G01 | Main hall, frontDemo room or gallery at the street front | Demo room or gallery at the street front | 502 SF (46.6 m²) |
| G02 | Main hall, tall partOpen main area | Open main area | 524 SF (48.7 m²) |
| U01 | Front officeTeam | Team | 407 SF (37.8 m²) |
| L01 | Loft officeTeam | Team | 141 SF (13.1 m²) |
| G10 | Pool courtyardTeam and customer events | Team and customer events | 1,228 SF (114.1 m²) |
For the fit-out and any change of use. The city: “All tenant improvements require building permits.” Source
Keep the front of the hall as an active use (showroom, gallery, public demo room, light manufacturing) or ask for an administrative modification under Planning Code Sec. 145.4(e).
Confirms the legal existing use. Worth having before signing. Source
Building work triggers an accessible path of travel to the altered area: entrance, toilets, signs. Below the state valuation threshold the spend is capped at 20% of the adjusted construction cost. Source
Only if nothing is built, the occupant load does not rise and the occupancy classification does not change. Otherwise drawn plans are required. Source
Fire permits are not transferable. Any change of operator or use needs a new permit. Source
For installing or changing a business sign or awning. Painted or vinyl lettering applied directly to windows, doors or the facade is exempt. Source
Before signing: the Certificate of Final Completion and Occupancy, older permits and job cards that are not online. $0.10 per page; up to 15 days. Source
Cost band: low.
Furniture, data cabling and meeting-room partitions in a finished space.
Time band: weeks.
No change to the structure. If the front stays an active use, there is nothing to ask of Planning beyond the normal permit.
What to check for this use before committing.
Office is by right, but the ground-floor front on 4th St must hold an active commercial use, which office is not. Office fits the 2nd floor and the rear; at the street front it would need a modification from the Zoning Administrator.